-TEPE CONSTRUCTION INDUSTRY CO. INC.
Meteksan Concept Building Electrical Installation Works.
(Completed on Date 30.05.2010.)
- SEMBOL-TACA JOINT VENTURE
Istanbul Harbiye Convention Centre Electrical Installation Works.
(Completed on Date 20.04.2010.)
- RENAISSANCE REAL-ESTATE INVESTMENT CO. INC.
Kadıköy Kozyatağı Municipal Council Culture Centre Building Electrical Installation Works.
(Completed on Date 20.04.2010.)
- TEPE CONSTRUCTION INDUSTRY CO. INC.
Meteksan Energy Renovation Works.
2 Units 1600 kVA Transformer Station
8 Units M.V. Cell and Assembling
1 Unit 1130 kVA Generator Assembling
(Completed on Date 30.12.2009.)
- OKYANUS CONTRACT CO. INC.
Forum Cappadocia Shopping Centre Electrical Installation Works.
(Completed on Date 31.12.2009.)
- ZEUGMA SHOPPING CENTRE CO. INC.
Gaziantep Sankopark Shopping Centre Electrical Installation works.
(Completed on Date 31.03.2009)
- TEPE CONSTRUCTION INDUSTRY CO. INC.
Bilkent University East Campus Refuge Lighting Works
(Completed on Date 31.12.2008)
- TEPE CONSTRUCTION INDUSTRY CO. INC.
Bilkent Hotel additional building LV-MV Electrical Installation works.
(Completed on Date 29.10.2008)
- TEPE CONSTRUCTION INDUSTRY CO. INC.
Forum Ankara Shopping Centre Electrical Installation works.
(Completed on Date 29.10.2008)
- TEPE CONSTRUCTION INDUSTRY CO. INC.
Forum Ankara Shopping Centre Bauhaus mall Electrical Installation works.
(Completed on Date 30.03.2008)
- UNAL BUILDING CONSTRUCTION CONTRACTING FOOD INDUSTRY and TRD. LTD. CO.
Ankara Metropolitan Municipality Water and Sewerage Works General Directorate (ASKİ) Çamlıdere Dam 2x16 kVA Transformer Installation and 2 (3x3/0) PIGEON 18.570 mt. Transmission line installation works.
(Completed on Date 30.10.2007)
- TACA – YORUM JOINT VENTURE
Forum Mersin Shopping Mall Construction Electrical Works
(Completed on Date 30.10.2007)
- SMS SAMSUN MACHINERY INDUSTRY CO. INC.
Ankara Metropolitan Municipality Water and Sewerage Works General Directorate (ASKİ) Çamlıdere Bayındır Dam 2x1600 kVA Energy Supply M.V. System Construction Work.
(Commenced on date 10.12.2006 and completed on date 28.12.2006)
- AYDIN PUBLISHING and EDUCATIONAL SERVICES LTD. CO.
Ankara Gölbaşı Nesibe AYDIN School Building Infrastructure Electrical Works.
(Completed on Date 31.12.2006)
- UNAL BUILDING CONSTRUCTION CONTRACTING FOOD INDUSTRY and TRD. LTD. CO.
Esenboğa Protocol Way and Eskişehir Road Widening, İncek-Gölbaşı Connection Raod, Saltoğlu Avenue-Ümitköy Connection Road, LV-MV line Displacement, reconstruction and Refuge Lighting Works in Road Superstructure Building work within scope of North Ankara Entrance Urban Transformation Project
(Completed on Date 31.12.2006)
- BIAT CONSTRUCTION INDUSTRY AND TRADE CO. INC. (ASKI) (Ankara Water Sewerage Works) General Directorate)
Construction Work of 8 Numbers of Bridge Crossings M.V. System (3280 kVA Installed Power 11 Numbers of Transformer Centres, 2 Numbers of Distribution Centres, 79.949 meters 36 kV 1x95 mm2 XLPE and 28.276 meters 36 kV 1x240 mm2 XLPE Cable Laying) fabrication and Various M.V. System Displacement Work.
(Completed on Date 31.10.2006)
- INDET-TURKERLER JOINT VENTURE.
Ego General Directorate Service Building Construction Electrical Installation Completion Works
(Completed on Date 31.12.2006)
- SANCAR CONSTRUCTION JOIN. SYST. IND. TRD. LTD. CO.
LV-MV Line Displacement, reconstruction and Refuge Lighting Works in Various Regions of Ankara.
(Completed on Date 30.06.2006)
- UNAL BUILDING CONSTRUCTION CONTRACTING FOOD INDUSTRY and TRD. LTD. CO.
İncek-Çayyolu Connecting Road, Etlik Ovacık Road LV-MV Line Displacement and Refuge Lighting Works.
(Completed on Date 30.12.2005)
- TROY CANADA INC.
+114, +117, +121 codes Electrical Installation Assembling Works of MIBC Central core “Moscow—City” Work (240.000 m2)
(Completed on Date 30.06.2006)
- TURKERLER CONSTRUCTION CO. INC.
Ankara EGO (Electricity Gas Bus) General Directorate Building Electrical Works (110.000 m2)
(Completed on Date 26.10.2006)
- GURİS CO. INC.
Ankara Sincan – Batıkent Subway Electrical Installation Works.
(Completed on Date 28.12.2006)
- OZTAS CONSTRUCTION CONSTR. MAT. TRD. CO. INC.
Sarıgerme Pegasos Tropical Hotel Electrical Works
(Completed on Date 30.05.2005)
Sarıgerme Pegasos Palace Hotel Electrical Works
(Completed on Date 30.06.2005)
- ZAFER CONTRACTING CONSTRUCTION and TRD. CO. INC.
PEPSI COLA Moscow and St. Petersburg Plants Electrical Works
(Completed on Date 30.06.2005)
- YIBITAS LAFARGE ENG. MACH. IND. TRD. CO. INC.
Yibitaş-Yozgat Counter Meter Assembling and Disassembling Works
Yibitaş-Yozgat Gas Analysis Works
Yibitaş-Sivas Counter Meter Assembling and Disassembling Works
Yibitaş-Sivas Gas Analysis Works
(Completed on Date 31.12.2004)
- TEPE CONSTRUCTION INDUSTRY CO. INC.
Konya M1 Tepe Shopping Mall Cinemaxx Electrical Works
(Completed on Date 12.11.2004)
- TEPE CONSTRUCTION INDUSTRY CO. INC.
Carrefoursa Maltepe Shopping Mall Construction Work Electrical Installation Works (130.000 m2)
(Completed on Date 30.12.2004)
- TURKISH TECHNOLOGY DEVELOPING FOUNDATION
TTGV Cyberpark Cyberplaza Electrical Installation Works
(Completed on Date 31.12.2004)
- TURKERLER CONSTRUCTION CO. INC.
Ankara Natural Gas New delivery point and Connected lines Electrical Works
(Completed on Date 30.11.2004)
- TURKERLER CONSTRUCTION CO. INC.
Türkerler Construction General Directorate Building Electrical Installation Works
(Completed on Date 30.06.2004)
- MESA HOUSE INDUSTRY CO. INC.
Mesa PRIVATE HOSPITAL M.V.-L.V. Electrical Installation Works (38.000m2)
(Completed on Date 15.12.2004)
- AKFEN - SERA BUILDING PARTNERSHIP
Cyber Plaza M.V. – L.V. Electrical Installation Works (40.000 m2)
(Completed on Date 30.06.2004)
- BINGOL 49. INTERIOR SECURITY BRIGADE L.V. * M.V. ELECTRICAL WORKS
1 Number of Separator Centre
5 Numbers of Transformer Centres
400 Numbers of Site Illuminating Masts
10.000lin. m. M.V. Cable Trench
10.000 lin. M. L.V. and Lighting Cable Trench
70 Numbers of L.V. Distribution Panels and Assembling of These
(Completed on Date 20.12.2003)
- BRUDO CONSTRUCTION LTD. CO.
P.T.L. and Transformer Plant construction work for Marble Pit
(Completed on Date 30.07.2003)
- MESA HOUSE INDUSTRY CO. INC.
Mesa MASLAK Dwellings Power Supply and Transformer Centres construction work (2x1250 kVA -6000 lin. m. 1x150/25 36 kV ) Trench work
(Completed on Date 30.07.2003)
- ASELSAN ELECTRONICS INDUSTRY CO. INC. (AYTİ)
POZANTI-MERSİN-İSKENDERUN-TOPRAKKALE (AYTİ) Emergency Help Telephone Connection Works
(Completed on Date 11.03.2003)
- CARREFOURSA CARREFOUR SABANCI TRADE CENTRE CO. INC.
Bağcılar CHAMPION-SA Shopping Mall M.V.-L.V. Electrical Works
(Completed on Date 04.06.2003)
- ANKARA UNIVERSITY YILDIRIM BEYAZIT STUDENT HOME GARDEN LIGHTING WORK
(Completed on Date 04.07.2002)
- REAL HYPERMARKETS CHAIN CO. INC.
Konya Real Electrical Installation Works
(Completed on Date 20.12.2002)
- TEPE CONSTRUCTION INDUSTRY CO. INC.
Kadıköy (NAUTILUS AVM) Shopping Mall (11,98 MVA)
Electrical Installation Works (≈ 180.000 m2)
Carrefoursa 2x1250 kVA, Electrical Installation and Automation
Tepe Home 1250 kVA
Common Sites 3(2000 kVA)
Cinemaxx 6 numbers of Cinemas (630 kVA)
Food Court Sites (1800 kVA)
Closed and open-air carparking areas electrical installation works
M.V. – L.V. Electrical Installation Works
Mechanical Automation Works
7 numbers of Generators in Various Powers and Assembling of These
29 numbers of M.V. Cells and Assembling of These
Co Gas Detection System
Fire Alarm Systems
Audio Sound Systems
Security Systems
Bus-Bar Systems
≈ 5000 lin. m. M.V. Cable and Assembling
≈ 350.000 lin. m. L.V. Power Cable and Assembling
≈ 400.000 lin. m. Weak Current Cable and Assembling
≈ 300.000 kg. Cable Duct and Assembling
≈ 650 Cells L.V. Distribution Panel and Assembling
≈ 20.000 Armature and Assembling
(Completed on Date 01.10.2002)
- ASELSAN ELECTRONICS INDUSTRY CO. INC. (OGS)
AUTOMATIC ACCESS SYSTEM INFRASTRUCTURE CONSTRUCTION AND CABLING WORKS 23 TOLL BOOTH SITES
(Highways Tolls)
Edirne Toll Booth Site
Havsa Toll Booth Site
Babaeski Toll Booth Site
Lüleburgaz Toll Booth Site
Saray Toll Booth Site
Fatih Sultan Mehmet Bridge Toll Booth Site
Körfez Toll Booth Site
Dil İskelesi Toll Booth Site
Kandıra Toll Booth Site
Sapanca Toll Booth Site
Kaynaşlı Toll Booth Site
Abant Toll Booth Site
Akıncılar Toll Booth Site
Urla Toll Booth Site
Tahtalı Çayır Toll Booth Site
Işıkkent Toll Booth Site
Belevi Toll Booth Site
Germencik Toll Booth Site
Aydın Toll Booth Site
Pozantı Toll Booth Site
Adana North Toll Booth Site
Çamtepe Toll Booth Site
Mersin Toll Booth Site
(Completed in year 2002)
- CARREFOURSA CARREFOUR SABANCI TRADE CENTRE CO. INC.
CARREFOUR-SA İzmir Hypermarket and İntem Shopping Mall Praktiker Section Electrical Works.
(Completed on Date 09.04.2001)
- TEPE CONSTRUCTION INDUSTRY CO.INC.
R.O.T. İs Bank Branch Repairs work
Bursa (M1 Shopping Mall) Branch
İskitler (Ankara) Branch
Demetevler (Ankara) Branch
A. Ayrancı (Ankara) Branch
Y. Ayrancı (Ankara) Branch
Midyat (Mardin) Branch
Gazi Mahallesi (Ankara) Branch
Etimesgut (Ankara) Branch
- REAL HYPERMARKETS CHAIN CO. INC.
Butcher Sites Electricity Extension Installation Works
(Completed on Date 30.07.2000)
- TEPE MARKET INVESTMENT REAL ESTATE and TRADING CO. INC. (ADANA)
Adana M1 Tepe Shopping Mall CINEMAXX Electrical Works (≈20.000 m2)
9 numbers of Cinemas – Foyer Areas – Electricity – Sounding - Fire Alarm-Security-Decorative Lighting and Automation works.
(Completed on Date 17.11.2000)
- TEPE MARKET INVESTMENT REAL ESTATE and TRADING CO. INC.
İstanbul Kartal Shopping Mall FOOD COURT Stores and Sites Electrical Installations and Decorative Lighting Works
(Completed on Date 15.06.2000)
- ASELSAN ELECTRONICS INDUSTRY AND TRADE CO. INC. (12.000m2)
ASELSAN Macunköy Plants MST Factory Building II. Part Construction Installation and Electrical works.
(Completed on Date 30.04.2000)
- TEPE HOME CO. INC. (≈11.000 m2)
ISTANBUL KARTAL SHOPPING MALL Tepe Home Section Electrical Installation works
(Completed on Date 31.12.1999)
- TEPE CONSTRUCTION INDUSTRY CO. INC. (90.000 m2)
BSV Bau Bauservice und Verwaltung Gmbh (10 MVA)
M1 ISTANBUL KARTAL SHOPPING MALL Electrical Installation works
REAL Shopping Mall Electrical Installation works
PRAKTIKER Shopping Centre Electrical Installation works
Big Stores Shopping Mall Electrical Installation works
Mall – Bazaar - Stores Shopping Mall Electrical Installation works
Open-Covered Car park and Environment Lighting Electrical Installation works
Common Utility Sites Electrical Installation works
Energy Supply and Distribution
MV and LV works (complete)
(Completed on Date 30.04.2000)
- ASELSAN ELECTRONICS INDUSTRY CO. INC.
EMERGENCY HELP TELEPHONE SYSTEM (AYTI)
Ankara Ringway (127 km)
Toprakkale-İskenderun Motorway (90 km)
- ASELSAN ELECTRONICS INDUSTRY CO. INC.
AUTOMATIC ACCESS SYSTEM (OGS) (AAS)
- İstanbul Bosphorus Bridge
- İstanbul Fatih Sultan Mehmet Bridge
- ASELSAN ELECTRONICS INDUSTRY CO. INC.
AUTOMATIC ACCESS SYSTEM (Highways Tolls) (OGS) (AAS)
İzmir Şehitlik Toll Booth Site
İzmir Alaçatı Toll Booth Site
İzmir Çeşme Toll Booth Site
İstanbul Hadımköy Toll Booth Site
İstanbul Çamlıca Toll Booth Site
İstanbul Mahmutbey Toll Booth Site
İstanbul Avcılar Toll Booth Site
İstanbul Samandıra Toll Booth Site
İstanbul Kurtköy Toll Booth Site
İstanbul Şekerpınar Toll Booth Site
İstanbul Kınalı Toll Booth Site
(Completed within year 1999)
- TEPE HOME CO. INC. (≈19.000 m2)
GAZİANTEP SHOPPING MALL Tepe Home Section Electrical Installation works
- PARMAŞ CO. INC. (TEPE CONSTRUCTION and INDUSTRY CO. INC.) (≈95.000 m2)
BSV Bau Bauservice und Verwaltung Gmbh 9,5 MVA
M1 TEPE GAZIANTEP SHOPPING MALL Electrical Installation works
REAL Shopping Mall Electrical Installation works
PRAKTIKER Shopping Mall Electrical Installation works
ADLER Shopping Mall Electrical Installation works
Big Stores Shopping Mall Electrical Installation works
Mall-Bazaar-Stores Shopping Mall Electrical Installation works
Open-Covered Car park and Environment Lighting Electrical Installation works
Common Utility Sites Electrical Installation works
Energy Supply and Distribution
MV and LV works (complete)
- TUBITAK (BILTEN)
TCDD STATIONS PRE-HEATING SYSTEM (34.5/1 Kv 7 MVA)
Ankara Behiçbey Station (Completed in year 1997)
İstanbul Haydarpaşa Station (Completed in year 1998)
İstanbul Sirkeci Railway Station (Completed in year 1998)
Eskişehir Railway Station (Completed in year 1998)
Konya Railway Station (Completed in year 1998)
Gaziantep Railway Station (Completed in year 1998)
Elazığ Railway Station (Completed in year 1999)
- PARMAŞ CO. INC. (TEPE CONSTRUCTION and INDUSTRY CO. INC.) (≈67.000 m2)
BSV Bau Service und Verwaltung Gmbh
BILKENT SHOPPING CENTRE CONSTRUCTION Electrical Installation works
REAL Shopping Centre Electrical Installation works
PRAKTIKER Shopping Centre Electrical Installation works
Mall – Bazaar - Stores Electrical Installation works
Open-Covered Car park and Environment Lighting Electrical Installation works
Full Building Automation
Common Utility Sites Electrical Installation works
MV and LV works (complete) 8 MVA
- R.O.T. IZMIR GOVERNORSHIP PROVINCIAL PRIVATE ADMINISTRATION DIRECTORATE
KINIK (IZMIR) ORGANIZED INDUSTRY ZONE work
P.T.L.
Construction Work of Main Distribution Centres
Main Distribution Centres Electrical Equipment Installation
Site Illumination Works
(Completed in year 1997)
- CAYYOLU COLLECTIVE HOUSING SITE
Electrical Power Supply and Site Lighting Installation work of 27 numbers of Cooperatives in.
(1994-1995)
- MARDEK TIMBER INDUSTRY AND TRADE CO. INC.
Mardek Factory Building Power Current and Site Lighting Installation work (1995)
- EBI A.Ş. (EBI CO. INC.) – ANKARA
M.E.T.U. Cafeteria Kitchen Repair work Electronic Panels Manufacturing and Assembling (1994)
M.E.T.U. MV Transformer and Generator Assembling work (1996)
M.E.T.U. Social Fac. RMU Assemblings work (1996)
- TUBITAK (TURKISH SCIENTIFIC AND TECHNICAL RESEARCH AUTHORITY) BILTEN – ANKARA (ISTANBUL ELEC. DISTRIBUTION NETWORK SCADA SYSTEM)
İstanbul Maslak Transformer Centre Assembling (1994)
İstanbul Distribution Transformer Centres (193 Transformer centres) SCADA system assembling works.
- M.E.T.U. RECTORATE – ANKARA
Çamlık Site Social Facilities Electrical works (1994)
Campus Surrounding Illumination work (1994)
Physics Department Amphitheatres Connection work (1994)
External Telephone Installation work between Information Proceed-Industrial Eng. Civ. Eng. (1994)
Rectorate Building 5 outputs Inverter Electrical Panel work (1994)
- S.S. HAVADAR HOUSE BUILDING COOPERATIVE CAYYOLU – ANKARA
ÇAYYOLU Parcel 18041 Collective Housing Field Site Lighting Installation work
(Completed in year 1993)
- S.S. OZAKIN HOUSE BUILDING COOPERATIVE – ANKARA
Batıkent Plot Parcel 17216 Constructions TEK Sanayi 2 Transformer Centre Ostim 2 (3x477.000) M.C.M. Conductor Concrete Mast P.T.L. Underground Embedding Work.
(Completed in year 1993)
- R.O.T. CENTRAL BANK GENERAL DIRECTORATE – ANKARA
Administrative Building Electrical Installation and 650 kVA Generator Extension and Main Panel Repair work
(Completed in year 1992)
- PARMAS GENERAL DIRECTORATE – ANKARA
Aliağa Thermal Plant Environment Assessment work
(Completed in year 1991)
- S.S. (SOCIAL SECURITY) APKAN HOUSE BUILDING COOPERATIVE –ANKARA
Çayyolu Collective Housing Field Constructions Infrastructue and Landscape Designing work
(Completed in year 1994)
- TURKISH ARMED FORCES SUPPORT FOUNDATION GENERAL DIRECTORATE ANKARA
Levent Marina Maritime Training Centre Workshop Building Boatyard site, Parking Building Construction Work
(Completed in year 1991)
Levent Marina Plants 70 ton floating lift construction work
(Completed in year 1990)
Levent Marina Plants Floating Jetty work
(Completed in year 1990)
Construction Work of İzmir Province, Konak District, İsmetkaptan Quart. Pamphlet 139, Plot 1025, Parcel 7 Office Building
(Completed in year 1992)
- ASELSAN MILITARY ELECTRONICS INDUSTRY CO. INC. – ANKARA
Gazi Tepesi (Gazi Hill) (Siteler) Trunk Radio Antenna Tower (1992)
İstanbul Kayışdağı and Çamlıca Hill Trunk Radio Antenna Tower (70 m.) (1992)
Hıdırlık Tepesi (Hıdırlık Hill) (Ankara) Trunk Radio Antenna Tower (1993)
- ASELSAN MILITARY ELECTRONICS INDUSTRY CO. INC. – ANKARA
POZANTI-TARSUS-MERSİN Motorway Emergency Help Telephone System Infrastructure work.
- ASELSAN MILITARY ELECTRONICS INDUSTRY CO. INC. – ANKARA
GÜMÜŞOVA-GEREDE Motorway Cable Emergency Help Telephone System Infrastructure work.
- ASELSAN MILITARY ELECTRONICS INDUSTRY CO. INC. – ANKARA
POZANTI – TEKİR - ÇAMALAN ANKARA GEREDE AND EDİRNE KINALI Motorway Toll System Infrastructure and Superstructure Works.
- ASELSAN MILITARY ELECTRONICS INDUSTRY CO. INC. – ANKARA
ANKARA - GEREDE and KINALI - EDİRNE Motorways Toll system Infrastructure Works
- M.E.T.U. PARLAR FOUNDATION
Construction Work of General Directorate Building (In Full)
- R.O.T. ISBANK GENERAL DIRECTORATE
Ankara Kitchen Building Electrical Works Repairs
- R.O.T. ISBANK GENERAL DIRECTORATE
Bayramoğlu Resting Facilities Treatment Plant and Waste Water Network Construction
- R.O.T. ISBANK GENERAL DIRECTORATE
Finike Branch - Kızılay Building - Bahçelievler Ankara Transformer Plants and Energy Supply work
- TEDAS MUGLA ELECTRICITY DISTRIBUTION ENTERPRISE DIRECTORATE
MARMARİS İÇMELER P.T.L. Installation work 30.000 lin. m. 1x240/25 mm2 XLPE Cable Energy transmission work.
(Completed in year 1996)
- TEDAS (TURKISH ELECTRICITY DISTRIBUTION INCORPORATED COMPANY) GENERAL DIRECTORATE - ANKARA
MARMARİS (MUĞLA) LV AND MV Electrical Installation Network work
2 Numbers of Step-Down Centres 2(2x10 MVA)
46 Numbers of Transformer Stations
780 Numbers of Concrete Masts and MV-LV Aerial Line Network
40.000 lin. m. 1x240/25 mm2 XLPE Cable
(Completed in year 1996)
- ASELSAN A.S. (ASELSAN CO. INC.)
AKYURT Factory Prototype Workshop
Construction-Electricity-Air Conditioning and Ventilation Installation Works
(Completed within year 1996)
- S.S. ERDEMKENT HOUSE BUILDING COOPERATIVE
Construction Work of 20 numbers of Triplex Dwellings (A Type) and Landscape Design
(Road, Water, Electricity, Natural Gas, Telephone, Sewerage Infrastructure Works)
(Completed on Date 20.09.1996)
- S.S. ERDEMKENT HOUSE BUILDING COOPERATIVE
Construction Work of 16 NUMBERS of Triplex Dwellings (A Type)
(Completed in year 1993)
- ASELSAN A.S. GENERAL DIRECTORATE – ANKARA (≈ 21.000 m2)
AKYURT Electrooptics factory construction work and Installation Works
Construction works
Mechanical Installation Works
Electrical Installation Works
Landscape Design and Lighting Works
- T.C.D.D. GENERAL DIRECTORATE
1. REGIONAL CHIEF DIRECTORATE İSTANBUL
(19 numbers of stations)
Lüleburgaz – Alpullu – Mandıra – Pehlivanköy – Kırcasalih - Abalar Tayyakadın - Edirne-Çerkezköy-Veli meşe – Çorlu – Balabanlı – Muratlı – Seyitler – Çatalca – Ispartakule - Kurfanlı-Kabakça and Sinekli Stations
P.T.L. Plant
Field Lighting Installation
Transformer Buildings Fabrication and Transformer Assembling
- T.C.D.D. GENERAL DIRECTORATE
5.REGIONAL CHIEF DIRECTORATE MALATYA
(20 numbers of stations)
Yazlak – Akçadağ – Suçatı – Doğanşehir – Kadılı – Kapıdere – Kunlu – Gölbaşı – Çelik - Haydarlı-Pazarcık – Dilek – Yazıhan – Sarsap – Kesikköprü – Hekimhan - Hasan Çelebi – Ulugüney - Akgedik and Demiriz Stations
P.T.L. Plant
Field Lighting Installation with Galvanized Masts
Transformer Assemblings
- S.S. ERDEMKENT BUILDING COOPERATIVE (≡280.000 m2)
215 numbers of Dwelling Electricity Distribution Site illumination and Telephone Distribution Systems work
- T.E.K. GENERAL DIRECTORATE
Çatalzeytin (Kastamonu) Electrical Installation work
14 Numbers of Transformers in various Powers
526 Numbers of Concrete Masts and M.V. –L.V. Aerial Line Network
36 kV M.V. Cable Distribution Line
(Completed on date 20.09.1991)
- T.E.K. GENERAL DIRECTORATE
Ürgüp (Nevşehir) Electrical Installation work
16 Numbers of Transformers in various Powers
690 Numbers of Concrete Masts and M.V. –L.V. Aerial Line Network
36 kV M.V. Cable Distribution Line
(Completed on date 28.11.1992)
- NETSEL A.Ş. (NETSEL CO. INC.)
Netsel Marmaris Marina Infrastructure Electrical Installations work
(Completed on Date 25.07.1989)
- T.E.K. GENERAL DIRECTORATE
MUCUR KIRŞEHİR Urban Network work
33 Numbers of Transformers in various Powers
1585 Numbers of Concrete Masts and M.V. –L.V. Aerial Line Network
36 kV M.V. Cable Distribution Line
(Completed on date 04.01.1994)
- AKPINAR BUILDING INDUSTRY CO. INC.
Urfa Tunnel P.T.L. and Compensation plants separator centre and 38 kV Distribution systems
(Completed within year 1987.)
- ENERGOINVEST
Osmaniye – Bursa – Aliağa – Gebze – İkitelli – Keban – Kepez – Seyitömer – Çarşamba – Kayabaşı – Çankırı – Osmanca - Sincan and İzmir (ışıklar) Switch Materials 380 kV separators assembling-disassembling test and commissioning works.
(Completed within year 1988)
14- WESTINGHOUSE SYSTEMS LIMITED (NATIONAL CHARGE DELIVERY 154 Kv-380 kV SCADA SYSTEM)
Adapazarı – Anbarlı – Babaeski – Bursa – Çatalağzı – Alibeyköy – İkitelli – Orhaneli - Osmanca Ümraniye – Aslantaş – Elbistan – Kangal - Keban I-Keban II-Erzin – Aliağa - Aliağa G.T.-Demirköprü – Işıklar – Kemer – Kovada – Oymapınar – Şalt-Oymapınar G.T.-Yeköy - Seydişehir-Soma – A – Soma - B- Tunçbilek – Yatağan – Çarşamba - Hasan Uğurlu - Hopa kayabaşı - Köklüce-Suat Uğurlu – Ankara – Sincan – Avanos – Çayırhan – Gökçekaya – Gölbaşı – Hirfanlı - Kayseri-Kesikköprü - Sarıyar Dams Signalling and power cables SCADA system assembling works
- HOLMES AND NARVER SERVICES INC.
Pirinçlik (Diyarbakır) Base Electrical Systems Analysis
(Completed within year 1988)
- HOLMES AND NARVER SERVICES INC.
Elmadağ Base Electrical Systems Analysis
(Completed in year 1988)
- T.C.D.D. (Republic of Turkey State Railways Enterprise) GENERAL DIRECTORATE
Karakaya Dam 2030 lin. m. Railway Bridge Illumination and Power Supply work
(Completed on Date 21.01.1988)
- T.E.K. GENERAL DIRECTORATE
Bozdoğan (Aydın) LV-MV Electrical network Masts and Building type transformer stations and P.T.L. Plants work
17 numbers of Transformers in various powers
1150 numbers of Concrete Masts and M.V. –L.V. Aerial Line Network
38 kV M.V. Cable Distribution Line
(Completed on date 05.08.1988)
- T.E.K. (TURKISH ELECTRICITY AUTHORITY) GENERAL DIRECTORATE
Bağararası SÖKE (AYDIN) LV-MV Electrical Network Masts and Building Type Transformer Stations and P.T.L. Plants work
26 numbers of Transformers in various powers
1010 numbers of Concrete Masts and M.V. –L.V. Aerial Line Network
375 numbers of Iron Mast M.V.-L.V. Aerial Line Network
36 kV M.V. Cable Distribution Line
(Completed on date 31.12.1987)
- TIGEM GENERAL DIRECTORATE
Gökhöyük-Ulaş-Alparslan-Iğdır Agricultural Enterprises Electrical Compensation Installation work
(Completed on Date 25.12.1985)
- ORUS INSTITUTION FORESTRY PRODUCTS INDUSTRY GENERAL DIRECTORATE
Akkuş-Ardeşen-Borçka-Antalya-Pazarköy-Düzce-Dursunbey-Fethiye-Demirbey-Bafra
Timber Factories Design and LV Compensation Facilities Construction work.
(Completed in year 1985)
- HOLMES AND NARVER SERVICES INC.
Mürted-Balıkesir-Eskişehir and Erhaç Bases Electrical Systems Analysis
(Completed at the end of year 1985)
- SABANCI GIRLS DORMITORY HV AND LV ELECTRICAL INSTALLATION work (≡20.000 m2)
Credit and Dormitories Authority - Yavuz Gömeç
Complete Transformer Assembling Including LV Compensation and Protection Control Panel
MV Energy supply
MV Cell Productions
Transformer and Assembling of it.
Boiler Room boards, Panel and Motor Supply Installation (Mechanical Electrical Works)
Laying of Full Grounding Lines of the systems indicated in items A.b.c.
Roof Exhaust Fans Supply Power and Control Electrical Installation and Designs regarding these Works
(Completed within year 1985)
- ASELSAN MILITARY ELECTRONOC INDUSTRY CO. INC.
34.5 Kv 920 lin. m. 1.35-16 mm2 2xHSY Cable Laying
34.5/0.4 kV 1250 kVA Transformer 1. Centre Assembling
34.5/0.4 kV 830 kVA Transformer 2. Centre Assembling
Assembling comp. Power plants
Central Automatic System Compensation
(Completed on Date 29.01.1984)
- ADANA ELECTRICAL PLANT
İller Bank Ömer ÖZKÖK Firm
For 31.5/15 kV 9 Step-Down 9(2x10) MVA and 2 Separator Centres (173 34.5 and 15 kV MV Feeder)
Control-Command-Signalling Panels
Protection Panels
AC-DC Distribution Panels
Design-Manufacture-Assembling and Commissioning
Step-Down and Separator Centres Feeder Assemblings
Commissioning of the System as a Whole
(Completed at the end of year 1984)
- KONYA TUMOSAN TRACTOR FACTORY (36.000 m2)
Construction Work of Transformer Building and Assembling of 1250 kVA Transformer Station
105 lin. m. 15 kV 3x25 /2x6 mm2 NYCEFY Cable Laying
Tractor Factory Power Distribution Plant
LV Distribution Panels Design, Manufacture and Assembling
Fire warning and Telephone Installation Fabrication and Assembling
1875 kVAR Automatic Reactive Power Compensation Batteries Fabrication and Assembling with New and Available Systems
50 Subscribers Telephone Line (3,5 km) and Distribution Installation
(Completed on Date 30.07.1983)
- MUS SUPPLY COMPANY P.T.L. and LV DISTRIBUTION
4,2 km. 31.5 kV Power Transmission Line of Common Masts
2 Numbers of 31.0/0.4 kV 400 kVA Transformer Centres
1321 lin. m. 31.5 kV 1x25 mm2 2xHSY MV Cable Installation
LV Distribution Masts Fabrication and Assembling
Site Illumination
Cold Storage Installation
(Completed on date 01.03.1983)